Online power, Danger – OnLine Power Phase Stabilizer User Manual
Page 47
OnLine Power
6002-032 REV H
3-8
3-1-7
Startup - Power-Reg, Ultra-Reg and Phase Stabilizer (100 - 400 kVA) (continued)
10. Replace
front
panel.
11. Unlock and turn ON power to facility circuit breaker.
The unit is ready for service.
3-1-8
Startup - Phase Stabilizer 15 - 100 kVA and Constant Power 18
After connecting the input and output cables and before placing the unit in service, verify the output voltage
using the following procedure.
Tools Required
• Phase Rotation Meter
• Voltage
meter
PROCEDURE:
1.
Verify that connected load is OFF.
2.
Turn OFF facility circuit breaker, lock and tagout according to OSHA requirements.
DANGER!!
FATAL ELECTRIC SHOCK HAZARD!! TO PREVENT FATAL ELECTRIC
SHOCK DISCONNECT POWER FROM UNIT AND LOCK OFF BEFORE YOU
PERFORM THE FOLLOWING PROCEDURE.
3. Open
front
door.
DANGER!!
FATAL SHOCK HAZARD!! LETHAL VOLTAGES EXIST WITHIN THE UNIT
DURING THE FOLLOWING CHECK. FOLLOW THE STEPS BELOW
EXACTLY. FAILURE TO DO SO COULD RESULT IN SEVERE INJURY OR
DEATH.