Online power – OnLine Power Phase Stabilizer User Manual
Page 41
OnLine Power
6002-032 REV H
3-2
3-1-2
Inspection
Perform the following Inspection procedure of the unit to check for obvious damage or safety hazards that may
have occurred during shipping or handling of the unit. All units must be inspected when received and again prior
to use. Any damage must be reported immediately to ON-LINE POWER, INC. or an authorized representative.
Freight damage claims should be initiated with the carrier.
CAUTION
Do not connect unit to building power until the following procedure has been completed.
1.
Inspect all external surfaces (panels, covers, etc.) for abrasions, indentations, or other obvious damage.
2.
File a claim with shipping agency for any damage caused by shipping.
3.
Forward a copy of damage claim to ON-LINE POWER, INC. at the following address:
ON-LINE POWER, INC.
5701 Smithway Street
City of Commerce, CA 90040
3-1-3
Input Cable Installation - Power-Reg, Ultra-Reg & Phase Stabilizer 100 - 400 kVA
The customer-furnished input power cable provides power from the building power source to the unit. Both the
circuit which feeds this cable and this cable should be dedicated to providing power only to this unit. This cable
must include three, power conductors and an insulated ground conductor. Size the cable to suit the unit kVA
rating, the input voltage and the overall length of the cable. The input power cable size and installation must be
in accordance with the National Electrical Code (NEC) and applicable local requirements.
A parity sized ground, with respect to the primary input conductors is recommended. The grounding conductor
is to be grounded to earth at the service equipment or other acceptable true building ground.
The unit has one 4-inch diameter hole in each side of the frame to accomodate the input and output power
cables. There are no holes in the side panels. The holes in the panels can be sized, located and punched or
drilled when the cable is installed. The input power cable can be connected through the left or right side of the
unit.
If cables are crossed or wires are likely to touch, insulating sleeves or their equivalent must be used to prevent
wires from touching.
Tools Required
• Phase Rotation Meter
CAUTION
Input power connection and required branch circuit breaker should be installed by a
licensed electrical contractor in accordance with local codes.