On-line power – OnLine Power Phase Stabilizer User Manual
Page 27
On-Line Power
6002-032 REV H
1-18
1-6
STARTING THE UNIT
This procedure is to be used only for starting the unit during the normal course of operation. Follow this
operating procedure any time the unit has been turned off in a non-emergency situation.
CAUTION
If this is the initial startup or if the unit has been moved, perform the
Startup procedure in Section 3-1-7 before applying power to the unit.
CAUTION
If the unit is connected to a Power Island modular distribution center, verify that all
panelboard output circuit breakers are OFF before turning on branch feeder circuit
breaker.
1.
Verify that Bypass Switch is set to AUTO.
2.
Verify that connected load is OFF.
3.
Energize facility branch circuit breaker.
4.
Open front door (Constant Power 18 only).
5.
Set IMCB to ON (Constant Power 18 only).
6. Close
front
door.
7.
Turn ON connected load.