Online power, Warning – OnLine Power Telecommunication User Manual
Page 31

OnLine Power
3-1
REV A
SECTION 3 - INSTALLATION AND OPERATION
3-1 PBC-II
UNPACKING
• The unit is delivered on a pallet, secured using metal bands. On removing the PBC-II from the pallet, be
sure to keep the protective wrapping in place. Use the following procedure to unpack the unit.
• Position the pallet away from walls or other obstructions.
• Be sure pallet is sitting level where bands can not hit anything.
CAUTION
WARNING!
Exercise extreme caution as you cut the metal bands. They are under tension and may
cause injury.
• Carefully remove the cardboard cover from unit; avoid puncturing the plastic bubble wrap with any sharp
object that may damage the surface of unit.
• The bubbles wrap covers the PBC-II and should be removed at location when the unit is to be mounted.
• Save the packing material to allow it to be used to keep the unit covered and protected until start- up.
• Place units in location where it’s used, then remove protective plastic film.
• Before final positioning of unit, verify that all cable routing and raceway are in the correct position.
3-2 INSPECTION
• Inspect the PBC-II for obvious damage or safety hazards that may have occurred during shipping or
handling of unit.
•
Inspect all units when received and before use.
• Inspect four (4) batteries located on each of the bottom and middle shelf to verify for no physical
damages nor any leakage thru battery.
•
Report any damage immediately to the originating factory, or to an authorized representative.
•
Initiate Freight damage claims with the carrier as soon as possible.
• Compare the contents and model numbers with the packing list to ensure that all of the items were
received.