47 | Start Up

NH-EL Start Up Checklist

Unit Serial #: _________________

Tag: _______________

Unit type: _______ __________

Voltage: ______V/____ph Steam output: ______ lb/hr

Cylinder Type:

Customer/Job:

Address:

Preliminary:

Pre-start-up checklist completed?

yes 

no 

If no, perform Pre-Start-up Checklist before starting humidifier.

Start-Up Procedure:

The prerequisites for the humidifier filling and contactor pulling in to make steam are as follows:

Plumbing door in Place and secured with screw

yes 

no 

Water supply valve opened

yes  no 

Mains disconnect switched on

yes  no 

Turn on the On/Off switch

yes  no 

On/Off Security loop (Terminal 1 and 2) closed

yes  no 

Controls:

Installed Controls Match Configuration

yes 

no 

Control Setpoint:

High Limit Setpoint:

Demand (Modulating Humidistat)

yes 

no 

or

Sensed RH < Setpoint (Transducer)

yes 

no 

The Humidifier will undergo a self-

test when the power is turned on activating the LED’s and other

internal components.

If the above listed prerequisites are fulfilled the humidifier will start filling the cylinder and begin
normal operation.

Remarks:


Started by:

Date of Start Up: _______/_______/______


Company:

Note: Most water does not contain enough conductivity for full boil on initial start-up. Units

will need to concentrate the water over a time period (hours to days). It is normal for
the humidifier status to cycle between “Filling” and “Warning – Max Level” indicating
water level is at the top of the cylinder during this time period.