46 nh-el pre-start up checklist, Nh-el pre-start up checklist – Nortec NH-EL Series User Manual
Page 49
Start Up | 46
NH-EL Pre-Start Up Checklist
Unit Serial #: _________________ Tag: _______________
Unit type: _______ __________
Voltage: ________V/_____ph Steam output: ______lb/hr
Cylinder type:
Customer/Job:
Address:
Water Quality:
Well water City water Softened water
Humidifier Mounting: (Clearances around the unit)
Level Front/Side Clearance
Steam Line(s):
Slope up (min 2 in/ft).
Slope down (min 0.500 in/ft)
Diameter / Size
Material
Low point condensate traps
No Hose Kinks / Restrictions
Type of Insulation
Condensate Line(s):
P Trap min 6 in or duct press + 2 in
P Trap min 12 in drop
Water Line:
Conductivity 150-750 microsiemens
Water pressure: 30-80 psig
Drain Line:
Air gap within 3 ft of the unit
Diameter / Size
Cylinder:
Seated in drain valve and secured
yes
no
Wiring:
Wiring connections and connectors secured
yes
no
Controls:
Control Location
Control to Terminal 4
High Limit Location
High Limit to terminal 5
Power:
Voltage, amp, fuse per Spec Label:
yes
no
Disconnect switch located close to humidifier
yes
no
Panel Number
Inspected by:
Date of inspection: ______/_______/______
Company: