Installation, Top vent venting runs – Montigo ME34-DV2 User Manual
Page 6
Page
Part No. XG0105B
ME34-DV-2 Homefire
Installation
Top Vent Venting Runs
For the ME34-DV-2 Top Vent, there are two types of installations: A)
Through-The-Wall Installations and B) Vertical (Through-The-Roof)
Installations.
A) Through-The-Wall Installations
Before you install any venting, you must determine whether the
venting run will be acceptable. Unacceptable venting can affect the
fireplace's combustion.
The Venting Graph
Measure the vertical height from the fireplace hearth to the centre of
the termination and the horizontal run from the from the fireplace flue
collar to the wall flange of the termination. Plot on the Venting Graph
(Fig. 7) with an 'X'.
If the 'X' falls on or above the top boundary of the shaded area, the
installation is acceptable.
Example A: (Acceptable Installation)
If the vertical dimension from the hearth is 84" and the
horizontal run to the wall flange of the vent termination
is 36", this would be an acceptable installation.
Example B: (Acceptable Installation)
If the vertical dimension from the hearth is 90" and the
horizontal run to the wall flange of the vent termination
is 126", this would be an acceptable installation.
Example C: (Unacceptable Installation)
If the vertical dimension from the floor of the fireplace is
78" and the horizontal run to the wall flange of the vent
termination is 108", this would noT be an accept-
able installation.
0 12 24 36 48 60 72 84 96 108
132
120
144 156 168 180
Horizontal Run (in.)
Hearth
0
12
24
36
48
60
72
84
96
108
Figure 8.
Heat Shield. Install by sliding over the vent pipe where it
passes through combustible construction.
Heat Shields
Due to high flue temperatures, heat shields
are required on all 34 Series Modular Direct
Vent installations (except those with vertical
terminations) at the point where the venting
connects to the termination. With the heat
shield, vent clearances can be maintained
at 1".
Figure 7.
ME34-DV-2 Top Vent Venting Graph
Top Vent
Available Top Vent Components
The following venting components are available for the ME34-DV-2
Top Vent:
A - Termination
MTO-3 (3" length)
MTO-3F (3" length)
B - Stucco Kits
MSR (stucco frame)
MOSR (stucco can)
BSR (brick can)
D - Flex sections
MFL-1 (12" section)
MFL-18 (18" section)
MFL-2 (24" section)
MFL-3 (36" section)
MFL-4 (48" section)
E - Solid sections
EXT-18 (18" f/f section)
MEXT-1 (12" m/f section)
MEXT-2 (24" m/f section)
MEXT-3 (36" m/f section)
MEXT-4 (48" m/f section)
F - Elbows
MEL-90M (m/m 90° elbow)
MEL-90F (f/f 90° elbow)
MEL-90FM (f/m 90° elbow)
EEL-45 (f/m 45° elbow)
NOTES:
All dimension lengths for vertical or horizontal runs are
measured from center of the vent pipe.
Venting runs
must fall within the limits set by the vent-
ing graph (see Figure 7).