beautypg.com

Installation, Installation of rear vent dv – Montigo ME34-DV2 User Manual

Page 10

background image

Page 10

Part No. XG0105B

ME34-DV-2 Homefire

Installation

Rear Vent

B. Multi-Elbow Installations

For more diffiicult installation situations, the ME34-DV-2 Rear Vent
may be installed with 2 - 90° elbows and up to 15' of horizontal run.
If using this installation option, you must adhere to the following
guidelines:

the first 90° elbow must be placed directly on the flue collar

you must have a minimum vertical lift of 50" (measured from the

hearth)

your vent run must fall within the limits set by Figure 19

Before you install any venting, you must determine whether the
venting run will be acceptable. Unacceptable venting can affect the
fireplace's combustion.

The Venting Graph

Measure the vertical height from the fireplace hearth to the centre of
the termination and the horizontal run from the from the fireplace flue
collar to the wall flange of the termination. Plot on the Venting Graph
(Fig. 19) with an 'X'.
If the 'X' falls on or above the top boundary of the shaded area, the
installation is acceptable.
Example A: (Acceptable Installation)

If the vertical dimension from the hearth is 84" and the
horizontal run to the wall flange of the vent termination
is 36", this would be an acceptable installation.

Example B: (Acceptable Installation)

If the vertical dimension from the hearth is 90" and the
horizontal run to the wall flange of the vent termination
is 126", this would be an acceptable installation.

Example C: (Unacceptable Installation)

If the vertical dimension from the floor of the fireplace is
78" and the horizontal run to the wall flange of the vent
termination is 108", this would noT be an accept-
able installation.

Figure 19.

ME34-DV-2 Rear Vent Venting Graph

0 12 24 36 48 60 72 84 96 108

132

120

144 156 168 180

Horizontal Run (in.)

Hearth

0

12

24

36

48

60

72

84

96

108

Installation Of Rear Vent DV

ME34-DV-2 Rear Vent versions are supplied with an EXT-18 (female/
female) section. In addition, the following venting components are
available for Rear Vent installations:
A - Termination

MTO-3 (3" length)

MTO-3F (3" length)

B - Stucco Kits

MSR (stucco frame)

BSR-4 (4" brick frame)

BSR-6 (6" brick frame)

MOSR (stucco can)

D - Flex sections

MFL-1 (12" section)

MFL-18 (18" section)

MFL-2 (24" section)

MFL-3 (36" section)

MFL-4 (48" section)

E - Solid sections

MEXT-1 (12" section)

MEXT-2 (24" section)

MEXT-3 (36" section)

MEXT-4 (48" section)

F - 90 degree elbow

MEL-90M (m/m 90° elbow)

MEL-90F (f/f 90° elbow)

MEL-90FM (f/m 90° elbow)

EEL-45 (f/m 45° elbow)

Figure 20.

Multi-elbow installation. Distance 'H' must be a minumum

of 50". The vent run must comply with figure 19.

NOTES:

All dimension lengths for vertical or horizontal runs are

measured from center of the vent pipe.

Venting runs

must fall within the limits set by the vent-

ing graph (see Figure 19).

8"

H

L

min 8"
max 18"