Installation, Installing the log set – Montigo ME34-DV2 User Manual
Page 12
Page 1
Part No. XG0105B
ME34-DV-2 Homefire
Installation
Figure 23a.
Wiring for optional air circulating fan kit.
Wiring for the
optional Fan Kit
All 34 Series Modular fireplaces feature an optional fan kit for circulat-
ing heat into the living space.
Installations in Canada which employ the fans must be electrically
grounded in accordance with CSA C22.1 Canadian Electrical Code
Part 1 and/or Local Codes.
Installations in the USA which employ the fans must be grounded
in accordance with local codes or, in the absence of local codes, with
the National Electrical Code, ANSI/NFPA 70-1987.
For more information see the Fan Kit Installation Guide included
with the fan kit.
NOTE:
If any of the original wire supplied with the appliance is replaced, it
must be replaced with the same type, or its equivalent.
G
L1-WH
L2-BLK
Quick Connect
plug to motor
Figure 23b.
Wiring schematic for optional fan kit.
115/1/60 Supply
G
L1 L2
Installing the Log Set
Installing the Logs:
The ME34-DV-2 is supplied with six ceramic fibre logs. Unpack the
logs and handle them very carefully.
1. Remove the door cover and the glass door.
2. Place the Back log onto the back log rest as shown below in
figure 8a. The log has lip on the bottom which fits into the slot on
the log rest.
3. Place the Front log onto the front log rest as shown in figure 8a.
Center the log from side to side, and push it against the back of
the log rest. Carefully push the log onto the metal spikes on the
log rest.
4. Place the top logs in position as shown in figures 8b and 8c.
5. Start the fireplace. If the flame appears satisfactory, replace the
glass door and door cover.
Figure 8a.
Positioning for the front and back logs.
Back log
Left log
Right log
Front log
Center logs
Figure 8b.
Proper top log placement (top view).
Back log
Left log
Right log
Front log
Center logs
Figure 8c.
Log placement as seen from the front of the stove.