beautypg.com

9 ethernet connection, 10 initial check and switching the device on – K-Patents PR-23 for K-Patents User Manual

Page 42

background image

Document/Revision No. IM-GB-PR23-ACP: Rev. 1.0 Effective: December 15, 2011

42

Appendix to the Instructions Manual PR-23

7.9 Ethernet connection

Description of requirements
Ethernet connections and wiring have been connected and set up in accordance with the the
PROCESS REFRACTOMETER PR-23 INSTRUCTION MANUAL

Section 12.

Requirement acceptance values
The Ethernet connections comply with the the PROCESS REFRACTOMETER PR-23
INSTRUCTION MANUAL

Section 12.

Date

Signature

Pass

*

Conditional Pass

Fail

*Conditional pass:

7.10 Initial check and switching the device on

Description of requirements
The initial check has been performed and the electrical power has been connected in
accordance with the PROCESS REFRACTOMETER PR-23 INSTRUCTION MANUAL
Section 5.1.1.

Requirement values
The corresponding screen displays occur in accordance with the PROCESS
REFRACTOMETER PR-23 INSTRUCTION MANUAL

Section 5.1.1.

Failure to meet acceptance values
Terminate the IQ.

Date

Signature

Pass

*

Conditional Pass

Fail

*Conditional pass: