beautypg.com

K-Patents PR-23 for K-Patents User Manual

Page 18

background image

Document/Revision No. IM-GB-PR23-ACP: Rev. 1.0 Effective: December 15, 2011

18

Appendix to the Instructions Manual PR-23

2.12 Wiring connections of transmitter to sensor, power

cable and computer

For Indicating transmitter DTR wiring and Ethernet connections instructions see PROCESS
REFRACTOMETER PR-23 INSTRUCTION MANUAL,

Section 3 and Section12. When the

wiring connections have been made sensor calibration and verification can commence.

Indicating Transmitter

DTR-M-GP-SC

Pharma Refractometer

PR-23-AC-62-HSS

Interconnecting cable

PR-8230

Crossover Cable

PR-8820

Power Supply Cable

(not supplied by K-Patents)

PC -Windows

(not supplied by K-Patents)

Figure 2.8 Connection diagram for sensor calibration verification.