K-Patents PR-23 for K-Patents User Manual
Page 18
Document/Revision No. IM-GB-PR23-ACP: Rev. 1.0 Effective: December 15, 2011
18
Appendix to the Instructions Manual PR-23
2.12 Wiring connections of transmitter to sensor, power
cable and computer
For Indicating transmitter DTR wiring and Ethernet connections instructions see PROCESS
REFRACTOMETER PR-23 INSTRUCTION MANUAL,
Section 3 and Section12. When the
wiring connections have been made sensor calibration and verification can commence.
Indicating Transmitter
DTR-M-GP-SC
Pharma Refractometer
PR-23-AC-62-HSS
Interconnecting cable
PR-8230
Crossover Cable
PR-8820
Power Supply Cable
(not supplied by K-Patents)
PC -Windows
(not supplied by K-Patents)
Figure 2.8 Connection diagram for sensor calibration verification.