beautypg.com

7 setting up the system components and devices – K-Patents PR-23 for K-Patents User Manual

Page 40

background image

Document/Revision No. IM-GB-PR23-ACP: Rev. 1.0 Effective: December 15, 2011

40

Appendix to the Instructions Manual PR-23

7.7 Setting up the system components and devices

Description of requirements
The Pharma Refractometer system with Refractometer sensor, Laboratory Test Cuvette
LTC and Indicating transmitter, are assembled and mounted correctly as described in the
Section 3 (this document). Also that the ancillary thermostatic bath and the sample delivery
system (if required) are connected in accordance with the

Section 3 (this document). The

ancillary equipment is switched on in accordance with the corresponding operating manuals.

Requirement acceptance values
The system and devices are complete and have been set up in compliance with
the instructions.

Failure to meet any of the acceptance values
Terminate the IQ.

Date

Signature

Pass

*

Conditional Pass

Fail

*Conditional pass: