beautypg.com

Assembly foils/connectors, Use bushings, connector, wedge, and red loctite, Entered each screw hole. if not, apply to screw – Harken 7410.10 MKIV Jib Reefing & Furling User Manual

Page 16

background image

Assembly foils/Connectors

16

MKIV Unit 0

Use bushings, connector, wedge, and

red Loctite

®

in other screw holes and

insert into other foil. Then inject 1/4–1/3 ml

of adhesive.

Inject only a small amount. A Unit 0 will

only take

1

/

4

to

1

/

3

of a graduation mark.

Tip: When you see a small amount of

adhesive enter one of the screw holes,

stop—you have applied enough adhesive.

Use “ml”

marks to

estimate

1

/

4

to

1

/

3

ml of

adhesive

Stop when you see a small

amount of adhesive enter

one of the sdrew holes.

Tighten screws into connector holes. Make

sure a drop of red Loctite

®

entered each

screw hole. If not, apply to screw.

Red Loctite

®

This manual is related to the following products: