Start-up checklist – Greenheck MSX (470658) User Manual

Page 16

background image

16

Modular Supply Make-Up Air Unit

®

Start-Up Checklist

Unit Model Number _______________________________

(e.g. MSX-120-H32-DB)

Unit Serial Number _______________________________

(e.g. 10111000)

Start-Up Date

_______________________________

Start-Up Personnel Name __________________________

Start-Up Company _______________________________

Phone Number

_______________________________

Pre Start-Up Checklist –

check boxes as items

are completed.

†Check tightness of all factory wiring connections

†Verify control wiring wire gauge

†Hand-rotate blower to verify free rotation

†Verify supply voltage to the main disconnect

†Verify remote controls wiring

Start-Up Blower Checklist –

refer to Blower

Start-Up section for further detail.

†Check line voltage

L1-L2 __________

L2-L3

__________

L1-L3

__________

†Check blower rotation

†Check for vibration

†Supply fan RPM

_________ RPM

†Motor nameplate amps _________ Amps

†Actual motor

L1 _______ Amps

L2

_______ Amps

L3

_______ Amps

†Actual CFM delivered

_________ CFM

Optional Accessories –

refer to Blower Start-Up

section, Step #6 for further detail.

†Heating Inlet Air Sensor

________

Actual

Setting

Typical setting 60º-70ºF (15º-21ºC)

†Cooling Inlet Air Sensor

________

Actual

Setting

Typical setting 75ºF (24ºC)

†Building Freeze Protection

________

Actual

Setting

Typical setting 5 minutes; 45ºF (7ºC)

†Dirty Filter Gauge

________

Actual

Setting

Typical setting varies

Start-Up Electric Heater (optional) –

refer to

Electric Heater Start-Up section for further detail.

†Check line voltage

L1-L2 __________

L2-L3

__________

L1-L3

__________

†Set the unit’s operating temperature

________

°F

Start-Up Evaporative Cooler (optional) –

refer

to Evaporative Cooler Start-Up section for further
detail.

†Check media orientation

†Check for proper water flow to distribution

headers

†Check for distribution header orientation to

prevent water spillage

Start-Up Checklist

SPECIAL TOOLS REQUIRED

• Voltage Meter (with wire probes)
• Amperage Meter
• Micro Amp Meter
• Tachometer
• Thermometer
• Incline manometer or equivalent