Equipment placement – FSR ML-800 User Manual
Page 11

ML-800
11
EQUIPMENT PLACEMENT
The ML-800RACK is mounted first. It should go in the audio rack at eye level usually 55 inches from
the finished floor.
The ML-PSA is mounted in the same rack as the ACU. It mounts in the rear of the rack usually at
waist level.
When the Facility Managers software, with audio monitoring (ML-116-AUD), is ordered then an-
other TRAC-BRAC with a ML-116-MNRL & MNP is also installed at the rear of the rack. This
completes the rack mounting of the ML-116 components.
The wallplates are mounted next. At least one wallplate is mounted in each room. In larger rooms
two wallplates may be required. The membrane wallplates mount in a standard 2 gang/3 gang electri-
cal box (min. depth 3 inches) and are connected to the cable already pulled. The touch wallplate
mounts directly in its own enclosure. Refer to the section on wallplates to determine proper hook-up.
If the Facility Managers software with audio monitoring (ML-116-AUD) was ordered then the
enclosed audio speaker, as well as the FM-INT small desk top mounted box, are located in the
Managers Office.
If the Remote Map and/or Monitor Panel was ordered then this unit will be mounted, most likely, in a
service corridor and will wired back to the ML-800RACK.
If the Lutron lighting interface was ordered then the ML-116-INT unit would be mounted in the
lighting dimmer rack location