beautypg.com

Start up operation, Configuring your inverter – Fronius IG 15 User Manual

Page 67

background image

59

ENEN

Start up Operation

Configuring your Inverter

Your FRONIUS IG unit has been pre-configured in the factory and is
ready for operation.

After connecting the FRONIUS IG unit to the solar modules (DC) and to
the public utility mains (AC), all you have to do is close the AC and DC
isolating switch.

Factory pre-
set configura-
tion

LED

Your personal
configuration

For your personal configuration please consult the chapter „Operating
Scheme“, section „Setup Menu“ of your operating instructions.

For settings to connect more than one inverter at the LocalNet (such as
numbering of the bus partners connected/system upgrading) please con-
sult the chapter LocalNet

- as soon as the photovoltaic modules produce sufficient power, the LED

lights up orange and the screen starts displaying the startup procedure

- the orange light of the LED indicates that the automatic startup proce-

dure of the FRONIUS IG unit will begin shortly

- after the FRONIUS IG unit has started automatically, the LED light turns

green

- the LED light continues green as long as power supply is fed into the

mains, it confirms that the operation continues to function without fault.

In case the initial operation of your FRONIUS IG unit does not proceed as
shown above and the FRONIUS IG unit does not start feeding power
supply into the mains network, you should consult the chapter „Error
Diagnosis and Repair“

This manual is related to the following products: