Electrical tests of the motor, Insulation test, Continuity testing – Flowserve Byron Jackson Type M User Manual
Page 53: Ter 6.8 "electrical tests of the motor", pag, Electrical tests of the motor, see, 8 "electrical tests", pa, 53). also

®
Byron Jackson Double Mechanical Seal Submersible Pumping Unit • 1042.293/9 • June
04
Page 53 of 68
•
Shut-off head reduced by 10 % - 15 %
Undertake maintenance before the next check 
period. 
•
Shut-off head reduced by > 15 %
The pump requires immediate attention and 
should not be run further. 
6.8 Electrical tests of the motor
DANGER
Do not conduct this test in an area
that has been designated a hazard-
ous location. 
6.8.1 Insulation
test
Before initial starting, as well as after longer stor-
age or idle time, the insulation resistance of the 
drive must be measured. 
DANGER
During and after the measurement, 
the connector ends of the motor line 
and/or the connection terminals 
partly carry dangerous voltage and 
may not be touched. 
Before the measurement, ensure 
that there is no line voltage. 
To measure the insulation, disconnect all leads of 
the power cable of the motor. 
All leads must carefully be cleaned of all dirt. Heed 
the operating instructions of the insulation measur-
ing device. 
Insulation measurement is always performed with 
a measuring-circuit voltage of 1000 V. The meas-
ured value must be read after a minute of meas-
urement duration. 
DANGER
The motor windings or power cable, 
charged up to the measuring-circuit 
voltage, must be discharged after 
measurement by means of the insu-
lation measuring device. 
The limits for minimum insulation resistance and 
critical insulation resistance for measurements at 
20 °C winding temperature are as follows: 
•
Critical insulation value after 
longer operational time ..........................10 M
Ω
CAUTION A relatively low insulation resis-
tance does not definitely show that 
the pumping unit will break down 
due to insulation problems. 
If however after measurements over 
a longer period of time, an extreme 
drop in the insulation resistance 
occurs within a short time, these 
must then be inspected. 
If the insulation resistance falls below minimum 
value, the cause or the malfunctioning part (power 
cable, line connection or windings) must be deter-
mined and the insulation weakness removed. 
6.8.2 Continuity
testing
1.
For continuity testing of the motor stator wind-
ings, use low resistance Ohm-Meter (4-pole 
Kelvin Bridge) 
2. Perform continuity test with motor. The termi-
nal resistance must first be measured in the 
three possible combinations (1-2, 1-3, 2-3). 
These three values must not vary by more 
than ± 2% from their average. The terminals 
must be grounded before the low resistance 
Ohm-Meter leads are connected. The tem-
perature of the winding in °C must also be 
measured and recorded. 