Arrange components for installation, Arrange components for installation, se – Flowserve Byron Jackson Type M User Manual
Page 24

Byron Jackson Double Mechanical Seal Submersible Pumping Unit • 1042.293/9 • June
04
Page 24 of 68
4.4.4
Arrange components for installation
Figure 7 Components arranged for installation
Refer to Figure 7. An orderly arrangement of sub-
assemblies will reduce the installation time.
1. Lay out the parts in order of installation, as
follows:
•
Motor
Arranged
horizontally.
•
Pump bowl assembly
Uncrated and arranged horizontally.
•
Riser pipes
Place all riser pipe sections with coupling
end toward the well.
Check couplings with chain tongs to
make sure they are screwed tight.
Place riser pipe check valve sections so
that each will be installed in the proper
sequence.
•
Power cable
•
Wellhead
•
Tools for installation, see Chapter
"Equipment and personnel required",
Page 19.
•
U-plate
2. Record the complete motor serial number
from the motor, see Chapter 3.1.3 "Motor se-
rial number", Page 14.
NOTE Make sure you can always quote each
part's serial number in correspon-
dence and when ordering spare parts
or further accessories.
3.
Check motor rating, horsepower, poles, volts,
and frequency against job requirements.