Cb 1 series, Administrator guide, Figure 1 figure 2 – Code Blue CB 1-E ECONOMICAL HELP POINT User Manual

Page 39

background image

Code Blue

259 Hedcor Street

Holland, MI 49423 USA

800.205.7186

www.codeblue.com

GU-157-E

page 39 of 71

CB 1 Series

Administrator Guide

4.3 120V AC supply – Using the proper crimping tool, attach a #8 fork to each of the incoming

power wires and fasten tem to the terminals as labeled on the transformer. After completing

the wire connections, install the supplied terminal covers.

Figure 1

Figure 2

(PAS 1-s as shown)

All wiring must be installed and connected by experienced and certified personnel to meet

local and national electrical codes, and will include a service disconnect.