5 6 finalizing the installation – Avalon Firestyles 564 SS Gas Installation User Manual
Page 56
5 6
Finalizing the Installation
(for qualified installers only)
Travis Industries
4 0 7 0 6 2 0
100-01188_000
3
Follow the directions below to replace the orifice.
1/2" Wrench
Use a 1/2” open end wrench
to unscrew the two orifices.
Screw each LP orifice in so the
orifice protrudes 15/16”
(indicating full insertion).
d
Look here for the orifice identification
Apply thread sealant to the LP
orifices prior to installation. Use
the chart below to identify the
correct orifices.
Front
Rear
NG
#56
#50
LP
#67
1.1
c
b
Front Burner
Orifice
a
Slide the air shutters all
the way to the right.
Rear
Burner
Orifice
15/16”
Remove and discard the front burner
gasket (used only for NG installations)
e
This manual is related to the following products: