beautypg.com

Hardware preparation and installation, 1 unpacking and inspecting the rtm, Chapter 2, hardware preparation and installation – Artesyn MVME8100 RTM (VXS1-RTM1) Installation and Use (April 2015) User Manual

Page 25: Chapter 2

background image

Chapter 2

VXS1-RTM1 Installation and Use (6806800P46C)

25

Hardware Preparation and Installation

This chapter describes the preparation before installing the RTM, the applicable environmental
and power requirements, and the actual installation and removal of the RTM.

2.1

Unpacking and Inspecting the RTM

Read all notices and cautions prior to unpacking the product.

Shipment Inspection

To inspect the shipment, perform the following steps:

1.

Verify that you have received all items of your shipment:

VXS1-RTM1

One printed copy of Quick Start Guide

One printed copy of Safety Notes Summary

Any other items ordered

Damage of Circuits

Electrostatic discharge and incorrect installation and removal of the blade can damage
circuits or shorten its life.

Before touching the blade or electronic components, make sure that you are working in
an ESD-safe environment.