Split feed operation – Tempest TornadoRetrofit Kits User Manual
Page 15

Tornado Enclosure User Manual
page 15
Split Feed Operation
Enclosure and luminaire have separate electrical feeds.
The enclosure circuit must be powered ON 24/7.
When splitting the feeders, both circuits should be on the same phase and at the same supply
voltage.
1 Use a wire cutter to cut the copper links on the
DEC3.2 board in four places.
2 Connect incoming ENCLOSURE power to the
terminals labeled MAINS. This supply MUST be
maintained 24/7.
(E) Earth/Ground (L) Live
(N) Neutral
3 Connect incoming LUMINAIRE power to the
terminals labeled SPLIT:
(E) Earth/Ground (L) Live
(N) Neutral
Projector Supply
(split mode)
Enclosure Supply
(100-250VAC 50/60Hz)
Fan 1
Fan 2
Heater(s)
Projector
receptacle
Cut here for split
supply operation
E L N
Luminaire
Power
E L N
Enclosure
Power