Commissioning, General wiring guidelines, 6commissioning – Pilz PNOZ mc10p SERCOS III User Manual
Page 19: 1 general wiring guidelines
Pilz GmbH & Co. KG, Felix-Wankel-Straße 2, 73760 Ostfildern, Germany
Telephone: +49 711 3409-0, Telefax: +49 711 3409-133, E-Mail: [email protected]
6-1
6.1
General wiring guidelines
6
Commissioning
6
6000
Commissioning
Commissioning
6-
6.1
General wiring guidelines
6100
General wiring guidelines
6-
Verdrahtung_PNOZ mc2p
The wiring is defined in the circuit diagram of the PNOZmulti Configura-
tor.
It is possible to define which inputs and outputs on the safety system will
communicate with sercos III.
Please note:
Information given in the “Technical details” must be followed.
Use copper wire that can withstand 75 °C.
Please note the following when connecting to sercos III:
The following minimum requirements of the connection cable and
connector must be met:
– Only use standard industrial Ethernet cable and connectors.
– Only use double-shielded twisted pair cable and shielded RJ45
connectors (industrial connectors).
– 100BaseTX cable in accordance with the Ethernet standard (min.
Category 5)
Measures to protect against interference:
Ensure the requirements for the industrial use of sercos III are met,
as stated in the Installation Manual published by the User Group.
Verdrahtung_multi_Achtung_Kabel_spannungsl_ziehen_Modul
CAUTION!
Only connect and disconnect the expansion module when the
supply voltage is switched off.