INSTALLATION
12.8 Commissioning
This menu allows you to carry out the necessary operations on
the appliances following installation.
• Using the buttons
, select
Commissioning on the screen.
• Press the button
to confirm.
12.8.1
filling the heating circuit
i
The Systempro control unit is used to open the
valves of each zone during filling, if more than one
heating zone is installed.
• Select
fill htg circuit on the screen
using the buttons
.
• Press the button
to confirm.
The screen shows the pressure
measured in the system.
• Activate filling mode by pressing the
button
.
• Refer to the boiler instructions for
filling the boiler.
The screen displays the pressure
measured in the system and that
installation filling is in progress.
• To stop filling press the button
.
• Close the filling loop.
• Press the button
to confirm.
12.8.2
Venting the heating circuit
Venting of the heating circuit enables the purging of any air in
the heating circuit.
• Using the buttons
,
select
Air venting on the screen.
• Press the button
to confirm.
• Open the different heating circuit air vent.
• Using the buttons
,
select
Vent heating circuit on the
screen.
• Press the button
to confirm.
• Confirm with the button
in
order to begin the venting process.
The venting process is carried out for
15 minutes. You can simultaneously run
the venting of the HP circuit.
• Press the button
.
b
When venting is complete, close the different
heating circuit air vent.