beautypg.com

Installation – Glow-worm Clearly Hybrid - Back-up Module System User Manual

Page 28

background image

0020096317_01 - 08/10 - Glow-worm

- 26 -

INSTALLATION

12.8 Commissioning

This menu allows you to carry out the necessary operations on

the appliances following installation.

• Using the buttons

, select

Commissioning on the screen.

• Press the button

to confirm.

12.8.1

filling the heating circuit

i

The Systempro control unit is used to open the

valves of each zone during filling, if more than one

heating zone is installed.

• Select

fill htg circuit on the screen

using the buttons

.

• Press the button

to confirm.

The screen shows the pressure

measured in the system.

• Activate filling mode by pressing the

button

.

• Refer to the boiler instructions for

filling the boiler.

The screen displays the pressure

measured in the system and that

installation filling is in progress.

• To stop filling press the button

.

• Close the filling loop.

• Press the button

to confirm.

12.8.2

Venting the heating circuit

Venting of the heating circuit enables the purging of any air in

the heating circuit.

• Using the buttons

,

select

Air venting on the screen.

• Press the button

to confirm.

• Open the different heating circuit air vent.

• Using the buttons

,

select

Vent heating circuit on the

screen.

• Press the button

to confirm.

• Confirm with the button

in

order to begin the venting process.

The venting process is carried out for

15 minutes. You can simultaneously run

the venting of the HP circuit.

• Press the button

.

b

When venting is complete, close the different

heating circuit air vent.