12 commissioning – Glow-worm 23c User Manual
Page 20

20
2000225000B
12 Commissioning
Please ensure the “Benchmark” logbook is completed and left
with the user.
The commissioning and first firing of the boiler must only be
done by a qualified registered person.
Gas installation
It is recommended that any air is purged from the supply at the
gas inlet test point on the gas valve, see diagram 12.1.
Filling the system 1 to 8
9973
9972
GAS INLET
TEST POINT
Diagram 12.1
1.
Make sure that:
• The boiler is connected to the electrical supply.
• The gas service cock is open.
Turn the switch OFF ( 0 )
3.
• Undo cap on automatic air vent on top of pump
and leave undone.
9974
4.
• Turn the switch ON ( I )
• Open the tap on the
filling device and fill the
system until the pressure
indicated on the display is
2 bar. Close filling device.
➜
➜
9838
2.
• Open the three boiler isolating valves. The slot
of the screw corresponds to flow direction.
(To unscrew turn anti-clockwise).
➜
➜
HEATING
RETURN
COLD
WATER IN
HEATING
FLOW
Fully open valves by
turning anti-clockwise.
- 12-38hxi Range (44 pages)
- 18-30sxi Range (48 pages)
- 24-38CXI Range (52 pages)
- 30ci Plus (56 pages)
- BBU 45/4 (32 pages)
- BBU 54/4 (32 pages)
- Betacom C (68 pages)
- Betacom2 (8 pages)
- Betacom2 (20 pages)
- Betacom2 (56 pages)
- Black Beauty 4 (20 pages)
- Chatsworth 4 (24 pages)
- Clearly Heat Recovery (20 pages)
- Clearly Heat Recovery (32 pages)
- Clearly Heat Pumps Envirosorb3 (28 pages)
- Clearly Heat Pumps Envirosorb2 (44 pages)
- Clearly Heat Pumps 7kW (44 pages)
- Clearly Heat Pumps 5kW (28 pages)
- Clearly Heat Pump 5kW (16 pages)
- Clearly Heat Pump 5 kW (32 pages)
- Clearly Heat Pump - Buffer Vessel (10 pages)
- Clearly Heat Pumps - Standalone Module System (40 pages)
- Clearly Heat Pumps - Standalone System (28 pages)
- Clearly Hybrid - Universal Module (20 pages)
- Clearly Hybrid - Universal Module System (36 pages)
- Clearly Hybrid - Compact Hydraulic Module (12 pages)
- Clearly Hybrid - Compact System (36 pages)
- Clearly Hybrid - Compact Hydraulic Module HB (16 pages)
- Clearly Hybrid - Back-up Module System (40 pages)
- Clearly Solar System Hydraulics (28 pages)
- Clearly Solar System (28 pages)
- Clearly Solar Controller (28 pages)
- Clearly Solar Horizontal On-Roof Collector (16 pages)
- Clearly Solar Vertical On-Roof Collector (16 pages)
- Clearly Solar Cylinders (32 pages)
- Clearly Solar - A-Frame (28 pages)
- Clearly Solar Horizontal In-Roof Collector (32 pages)
- Clearly Solar Vertical In-Roof Collector (44 pages)
- Clearly Solar Collector Container (8 pages)
- Climapro 1 (12 pages)
- Climapro2 RF (16 pages)
- Climapro2 RF (24 pages)
- Climapro2 RF (36 pages)
- Climapro2 RF (32 pages)