beautypg.com

EXFO IQS-12002B Calibration System User Manual

Page 40

background image

Operating Your Calibration System

36

IQS-12002B

Performing a Test

19. The application displays a preview of the report. It will also be possible

to print or export results afterwards (see Printing or Exporting Results
on page 37).

Note: To let the application consider the test sequence completed, you must

perform a print or export of the report. As long as this is not done, the
sequence will remains in the Open Sequence dialog windows and the
results will not be accessible in the DUT history or traceability reports.

When you have finished, click Close.

To launch an existing test sequence:
1.
From the Operations menu, click Open Sequence.

2. Follow the instructions appearing on screen.

To resume a test sequence:
From the Operations menu, click Run Sequence.

The application will resume the test from where it stopped.

To change the default

location of the .pdf file