Performing a test, Arning – EXFO IQS-12002B Calibration System User Manual
Page 33
Operating Your Calibration System
29
Performing a Test
Performing a Test
The test sequence you have built can be used immediately or saved it for
future use. Once a test is underway, you can stop it and resume it later
from the point it was stopped.
The application will guide you through the necessary steps from DUT
creation to printing results. You can generate reports that are ISO/IEC 17025
compliant. They can take into account measurement uncertainties or not
(i.e. pass or fail status without considering uncertainties). You can also
export results to a PDF file.
Note: It is also possible to perform several tasks, such as adding a new DUT or a
new customer, directly from the application menus.
Note: When creating a new sequence, the system verifies that all necessary
connected standards are present in the platform. If there are more
connected standards of a particular kind than needed, the system reserves
them in the detection order (unit 1 and slot 1, unit 1 and slot 2, and so on).
If you would like to use other connected standards than the reserved ones,
you must remove the undesired standards from the platform.
W
ARNING
Do not install or terminate fibers while a light source is active.
Never look directly into a live fiber and ensure that your eyes are
protected at all times.
W
ARNING
Use of controls, adjustments and procedures for operation and
maintenance other than those specified herein may result in
hazardous radiation exposure.