beautypg.com

Performing a test, Arning – EXFO IQS-12002B Calibration System User Manual

Page 33

background image

Operating Your Calibration System

Calibration System

29

Performing a Test

Performing a Test

The test sequence you have built can be used immediately or saved it for
future use. Once a test is underway, you can stop it and resume it later
from the point it was stopped.

The application will guide you through the necessary steps from DUT
creation to printing results. You can generate reports that are ISO/IEC 17025
compliant. They can take into account measurement uncertainties or not
(i.e. pass or fail status without considering uncertainties). You can also
export results to a PDF file.

Note: It is also possible to perform several tasks, such as adding a new DUT or a

new customer, directly from the application menus.

Note: When creating a new sequence, the system verifies that all necessary

connected standards are present in the platform. If there are more
connected standards of a particular kind than needed, the system reserves
them in the detection order (unit 1 and slot 1, unit 1 and slot 2, and so on).
If you would like to use other connected standards than the reserved ones,
you must remove the undesired standards from the platform.

W

ARNING

Do not install or terminate fibers while a light source is active.
Never look directly into a live fiber and ensure that your eyes are
protected at all times.

W

ARNING

Use of controls, adjustments and procedures for operation and
maintenance other than those specified herein may result in
hazardous radiation exposure.