Ordering the devices – Echelon Rapid Deployment Example for EES User Manual
Page 14
![background image](/manuals/735737/14/background.png)
4
Using the Rapid Deployment Example
The following sections describe how to perform these steps.
Note: If you are using an i.LON e3 plus Internet Server for the demonstration network, you must
install the SmartServer 2.0 software from the i.LON SmartServer 2.0 DVD, and manually upgrade
your i.LON e3 plus Internet Server before deploying the included i.LON template. For more
information on installing the SmartServer 2.0 software, see Chapter 2 of the i.LON SmartServer 2.0
User’s Guide. For more information on manually upgrading an i.LON 100 e3 plus Server to the
SmartServer 2.0 firmware, see Chapter 3 of the i.LON SmartServer 2.0 User’s Guide.
Ordering the Devices
The demonstration network uses one TP/FT-10 SmartServer, five L
ON
W
ORKS
devices (two switches,
two thermostats, one energy meter), two generic lamp outputs (>2 amps), one 24VDC power supply,
and one 24VAC transformer. The following table lists the required devices, provides links where you
can order them, and describes their functionality in the demonstration network:
Item Qty
Part
Number/Source
Description
SmartServer (TP/FT-10)
1
72101R-4xx (FT)
Interfaces, installs, monitors, and
controls network.
Energy Meter
1
Nico 8108L-R1
Measures individual load
consumption. Displays power
consumption.
Switch 2
Nico
5006L
Provides 6-switch input.
Thermostat 1
Honeywell
T7350H
Controls an air conditioning unit
and shows space temperature.
Thermostat 1
Distech
EC-STAT-RT2E
Controls an air conditioning unit
and shows space temperature.
Load (Lamp)
2
any ≥200 watt lamp
Provides lighting output.
24VDC Power Supply
1
any 24VDC transformer
Supplies power to the L
ON
W
ORKS
devices on the network.
24VAC Transformer
1
any 24VAC transformer
Supplies power to the L
ON
W
ORKS
devices on the network.