Rt115q operator’s manual – Ditch Witch RT115 Q User Manual
Page 88
RT115Q Operator’s Manual
Trench - 87
Operation
CMW
Finish Trenching
1.
When trench is complete, move ground drive hand control to neutral.
2.
Adjust throttle to low idle.
3.
Raise boom.
4.
As boom clears top of trench, move attachment speed/direction control to neutral.
5.
Raise trench cleaner.
6.
Swivel seat to the drive position.
7.
Disengage axle lock.
8.
Drive a short distance away from work site. See page 66 for driving procedures.
9.
Shut down tractor. See page 67 for proper shutdown procedures.
10. Stow trench cleaner.
IMPORTANT: Drive tractor in reverse 6’ (2 m) while turning steering wheel left to right to fully
disengage axle lock.
See also other documents in the category Ditch Witch Special machinery:
- JT5 (161 pages)
- JT922 (159 pages)
- JT9 (165 pages)
- JT20 (195 pages)
- JT1220 (201 pages)
- JT2020 (203 pages)
- JT25 (203 pages)
- JT30 (245 pages)
- JT60 (218 pages)
- JT100 (243 pages)
- AT Air Hammer (11 pages)
- TK Series Manual (61 pages)
- 8500 (77 pages)
- MR90 (121 pages)
- FT5 (28 pages)
- FM5 (57 pages)
- FM13V (46 pages)
- FM25 (67 pages)
- P80 (71 pages)
- OnGrade (63 pages)
- FX20 (100 pages)
- FX25 (119 pages)
- FX30 (149 pages)
- FX50 (141 pages)
- FX60 (157 pages)
- MV800 (111 pages)
- RT Line (115 pages)
- RT30 (97 pages)
- RT45 (203 pages)
- RT55 (177 pages)
- RT100 (161 pages)
- RT115 (252 pages)
- RT120 (223 pages)
- Zahn (105 pages)
- RT80 (203 pages)
- RT120 Q (211 pages)
- 100SX (50 pages)
- 410SX (131 pages)
- SK350 (77 pages)
- SK750/SK755 (81 pages)
- SK850 (107 pages)
- SK850 Footings Machine (107 pages)
- 150RT (55 pages)
- 250RT (49 pages)