Rt115q operator’s manual – Ditch Witch RT115 Q User Manual
Page 145
Service - 144
RT115Q Operator’s Manual
100 HOUR
Check Track Tension
Check track tension every 100 hours.
To check:
1.
Elevate unit on jackstands, or lifting devices
capable of holding the weight of the tractor.
2.
Measure tension using one of the methods
below. Track is tensioned correctly when:
•
the track just comes into contact with the
middle rollers,
•
when there is a 1/4” gap between the
tracks and the middle rollers,
•
or when grease pressure is 1400-1600
psi.
To adjust:
1.
Loosen bolts on each cylinder end (2).
2.
Pump MPG into zerk (1) until track is correctly tensioned.
3.
Tighten bolts on cylinder end (2).
Inspect Track Rollers and Sprocket
Inspect track rollers and sprocket for wear every
100 hours. Replace as needed.
See also other documents in the category Ditch Witch Special machinery:
- JT5 (161 pages)
- JT922 (159 pages)
- JT9 (165 pages)
- JT20 (195 pages)
- JT1220 (201 pages)
- JT2020 (203 pages)
- JT25 (203 pages)
- JT30 (245 pages)
- JT60 (218 pages)
- JT100 (243 pages)
- AT Air Hammer (11 pages)
- TK Series Manual (61 pages)
- 8500 (77 pages)
- MR90 (121 pages)
- FT5 (28 pages)
- FM5 (57 pages)
- FM13V (46 pages)
- FM25 (67 pages)
- P80 (71 pages)
- OnGrade (63 pages)
- FX20 (100 pages)
- FX25 (119 pages)
- FX30 (149 pages)
- FX50 (141 pages)
- FX60 (157 pages)
- MV800 (111 pages)
- RT Line (115 pages)
- RT30 (97 pages)
- RT45 (203 pages)
- RT55 (177 pages)
- RT100 (161 pages)
- RT115 (252 pages)
- RT120 (223 pages)
- Zahn (105 pages)
- RT80 (203 pages)
- RT120 Q (211 pages)
- 100SX (50 pages)
- 410SX (131 pages)
- SK350 (77 pages)
- SK750/SK755 (81 pages)
- SK850 (107 pages)
- SK850 Footings Machine (107 pages)
- 150RT (55 pages)
- 250RT (49 pages)