Rt115q operator’s manual – Ditch Witch RT115 Q User Manual
Page 52
RT115Q Operator’s Manual
Controls - 51
Backhoe Console
CMW
10. Bucket/dipper control
To open bucket, move right.
To close bucket, move left.
To move dipper in, pull.
To move dipper out, push.
Control can perform more than one
action at a time. By “feathering” the
control, operator can combine
backhoe operations.
11. Stow lock control
To lock:
•
Raise boom fully.
•
Pull stow lock handle.
•
Lower boom slightly to
engage lock.
•
Insert swing lock pin.
To unlock:
•
Remove swing lock pin.
•
Raise boom slightly.
•
Push stow lock handle to
release lock.
Use this control to lock boom in the up
position.
NOTICE: Always use stow lock and
install swing lock pin during transport.
When unlocked, store swing lock pin
in holder located on left stabilizer
support.
12. Right stabilizer control
To lower, push out.
To raise, pull in.
Item
Description
Notes
- JT5 (161 pages)
- JT922 (159 pages)
- JT9 (165 pages)
- JT20 (195 pages)
- JT1220 (201 pages)
- JT2020 (203 pages)
- JT25 (203 pages)
- JT30 (245 pages)
- JT60 (218 pages)
- JT100 (243 pages)
- AT Air Hammer (11 pages)
- TK Series Manual (61 pages)
- 8500 (77 pages)
- MR90 (121 pages)
- FT5 (28 pages)
- FM5 (57 pages)
- FM13V (46 pages)
- FM25 (67 pages)
- P80 (71 pages)
- OnGrade (63 pages)
- FX20 (100 pages)
- FX25 (119 pages)
- FX30 (149 pages)
- FX50 (141 pages)
- FX60 (157 pages)
- MV800 (111 pages)
- RT Line (115 pages)
- RT30 (97 pages)
- RT45 (203 pages)
- RT55 (177 pages)
- RT100 (161 pages)
- RT115 (252 pages)
- RT120 (223 pages)
- Zahn (105 pages)
- RT80 (203 pages)
- RT120 Q (211 pages)
- 100SX (50 pages)
- 410SX (131 pages)
- SK350 (77 pages)
- SK750/SK755 (81 pages)
- SK850 (107 pages)
- SK850 Footings Machine (107 pages)
- 150RT (55 pages)
- 250RT (49 pages)