Trencher, Plow – Ditch Witch RT115 Q User Manual
Page 143
Service - 142
RT115Q Operator’s Manual
50 Hour
Trencher
Check Trencher Gearbox Oil
Check oil at sight tube every 50 hours. Keep oil
level at horizontal line on housing. If necessary,
add MPL at fill plug.
Plow
Change Plow Vibrator Oil
Change plow vibrator oil after first 50 hours of
operation. Drain oil at drain plug (2). Replace
plug and move plow vibrator to horizontal
position. Add MPL at fill (1) until oil is halfway up
sight glass (2). Refill capacity is 4 qt (3.8 L).
Hot parts may
cause burns. Do not touch until
cool.
See also other documents in the category Ditch Witch Special machinery:
- JT5 (161 pages)
- JT922 (159 pages)
- JT9 (165 pages)
- JT20 (195 pages)
- JT1220 (201 pages)
- JT2020 (203 pages)
- JT25 (203 pages)
- JT30 (245 pages)
- JT60 (218 pages)
- JT100 (243 pages)
- AT Air Hammer (11 pages)
- TK Series Manual (61 pages)
- 8500 (77 pages)
- MR90 (121 pages)
- FT5 (28 pages)
- FM5 (57 pages)
- FM13V (46 pages)
- FM25 (67 pages)
- P80 (71 pages)
- OnGrade (63 pages)
- FX20 (100 pages)
- FX25 (119 pages)
- FX30 (149 pages)
- FX50 (141 pages)
- FX60 (157 pages)
- MV800 (111 pages)
- RT Line (115 pages)
- RT30 (97 pages)
- RT45 (203 pages)
- RT55 (177 pages)
- RT100 (161 pages)
- RT115 (252 pages)
- RT120 (223 pages)
- Zahn (105 pages)
- RT80 (203 pages)
- RT120 Q (211 pages)
- 100SX (50 pages)
- 410SX (131 pages)
- SK350 (77 pages)
- SK750/SK755 (81 pages)
- SK850 (107 pages)
- SK850 Footings Machine (107 pages)
- 150RT (55 pages)
- 250RT (49 pages)