Planning, Trenching, Plowing – Ditch Witch RT115 Q User Manual
Page 55: Rt115q operator’s manual
Operation Overview - 54
RT115Q Operator’s Manual
Planning
CMW
Planning
1.
Gather information about jobsite. See page 58.
2.
3.
Classify jobsite. See page 60.
4.
Select chain and teeth to match your soil type, if necessary. See page 120.
5.
Check supplies and prepare equipment. See page 62.
6.
Haul equipment to jobsite. See page 76.
Trenching
1.
2.
Position tractor and controls. See page 83.
3.
4.
Engage cruise control if desired. See page 118.
5.
Engage optional Trench Depth Meter if desired. See page 120.
6.
Complete the installation. See page 87.
7.
Shut down tractor. See page 67.
Plowing
1.
2.
Position tractor and controls. See page 91.
•
•
•
3.
4.
5.
Engage cruise control if desired. See page 118.
6.
Complete the installation. See page 123.
7.