Rt115q operator’s manual – Ditch Witch RT115 Q User Manual
Page 141
Service - 140
RT115Q Operator’s Manual
10 Hour
Check Plow Arm Pins and Bushings
Check plow arm pins and bushings every 10
hours. Tighten as needed.
Check Plow Connector Pivots
Visually check pivots every 10 hours for wear or
damage.
Check Attachment Mounting Bolts
Check mounting bolts every 10 hours and torque
as necessary to keep bolts and other fasteners
tight. Check for looseness or wear. Apply Loctite
271
®
adhesive. Check that bolts are torqued to
200 ft•lb (271 N•m).
See also other documents in the category Ditch Witch Special machinery:
- JT5 (161 pages)
- JT922 (159 pages)
- JT9 (165 pages)
- JT20 (195 pages)
- JT1220 (201 pages)
- JT2020 (203 pages)
- JT25 (203 pages)
- JT30 (245 pages)
- JT60 (218 pages)
- JT100 (243 pages)
- AT Air Hammer (11 pages)
- TK Series Manual (61 pages)
- 8500 (77 pages)
- MR90 (121 pages)
- FT5 (28 pages)
- FM5 (57 pages)
- FM13V (46 pages)
- FM25 (67 pages)
- P80 (71 pages)
- OnGrade (63 pages)
- FX20 (100 pages)
- FX25 (119 pages)
- FX30 (149 pages)
- FX50 (141 pages)
- FX60 (157 pages)
- MV800 (111 pages)
- RT Line (115 pages)
- RT30 (97 pages)
- RT45 (203 pages)
- RT55 (177 pages)
- RT100 (161 pages)
- RT115 (252 pages)
- RT120 (223 pages)
- Zahn (105 pages)
- RT80 (203 pages)
- RT120 Q (211 pages)
- 100SX (50 pages)
- 410SX (131 pages)
- SK350 (77 pages)
- SK750/SK755 (81 pages)
- SK850 (107 pages)
- SK850 Footings Machine (107 pages)
- 150RT (55 pages)
- 250RT (49 pages)