beautypg.com

Ditch Witch RT115 Q User Manual

Page 10

background image

RT115Q Hydrostat Operator’s Manual

Contents - 9

CMW

Contents

Overview

machine serial number, information about the type of work this machine is designed
to perform, basic machine components, and how to use this manual

1

Foreword

part number, revision level, and publication date of this manual, and factory contact
information

7

Safety

machine safety alerts and emergency procedures

11

Controls

machine controls, gauges, and indicators and how to use them

21

Operation Overview

an overview for completing a job with this machine: planning, setting up, installing
product, and restoring the jobsite; with cross references to detailed procedures

53

Prepare

procedures for inspecting and classifying the jobsite, planning the installation path,
and preparing the jobsite for work

57

Drive

procedures for startup, cold start, driving, and shutdown

63

Transport

procedures for lifting, hauling, and towing

69

Trench

procedures for trenching

81

Plow

procedures for plowing

89

Reel Winder

procedures for using reel winder

99

Backhoe

procedures for digging with backhoe

103