Drill rod and equipment, Rt115q operator’s manual – Ditch Witch RT115 Q User Manual
Page 113
Drill - 112
RT115Q Operator’s Manual
Prepare Jobsite and Equipment
CMW
Drill Rod and Equipment
1.
Assemble at least 20’ (6 m), but not more than 30’ (9 m), of drill rod.
2.
Install drill bit to the cutting end of the drill string.
3.
Put drill string in approach trench.
4.
Move tractor to the approach trench and align the drilling attachment with the intended bore path.
5.
Turn off engine.
6.
Attach drill string to drilling attachment.
NOTICE: More than 10-15’ (3-4.5 m) of drill rod out of the trench increases the tendency of drill
rod to bend.
See also other documents in the category Ditch Witch Special machinery:
- JT5 (161 pages)
- JT922 (159 pages)
- JT9 (165 pages)
- JT20 (195 pages)
- JT1220 (201 pages)
- JT2020 (203 pages)
- JT25 (203 pages)
- JT30 (245 pages)
- JT60 (218 pages)
- JT100 (243 pages)
- AT Air Hammer (11 pages)
- TK Series Manual (61 pages)
- 8500 (77 pages)
- MR90 (121 pages)
- FT5 (28 pages)
- FM5 (57 pages)
- FM13V (46 pages)
- FM25 (67 pages)
- P80 (71 pages)
- OnGrade (63 pages)
- FX20 (100 pages)
- FX25 (119 pages)
- FX30 (149 pages)
- FX50 (141 pages)
- FX60 (157 pages)
- MV800 (111 pages)
- RT Line (115 pages)
- RT30 (97 pages)
- RT45 (203 pages)
- RT55 (177 pages)
- RT100 (161 pages)
- RT115 (252 pages)
- RT120 (223 pages)
- Zahn (105 pages)
- RT80 (203 pages)
- RT120 Q (211 pages)
- 100SX (50 pages)
- 410SX (131 pages)
- SK350 (77 pages)
- SK750/SK755 (81 pages)
- SK850 (107 pages)
- SK850 Footings Machine (107 pages)
- 150RT (55 pages)
- 250RT (49 pages)