beautypg.com

Venting installation instructions – Desa V)CD36RN User Manual

Page 12

background image

www.desatech.com

116035-01E

1

VENTING INSTALLATION

INSTRUCTIONS

Continued

WARNING: Do not recess

vent termination into any wall.

This will cause a fire hazard.

6.

Noncombustible Exterior Wall:

Position the

horizontal vent cap in the center of the 8

1

/

2

"

round hole and attach to the exterior wall with

four wood screws provided. Before attaching

the vent cap to exterior wall, run a bead of

non-hardening mastic (pliable sealant) around

the outside edges to make a seal between it and

the outside wall. Note: The four wood screws

provided should be replaced with appropriate

fasteners for stucco, brick, concrete or other

types of sidings (see Figure 13).

Combustible Exterior Wall:

For vinyl siding,

stucco or wood exteriors, a siding standoff

may be installed between the vent cap and

exterior wall. The siding standoff prevents

excessive heat from damaging the siding

materials. Siding material must be cut to

accommodate standoff. Bolt the vent cap to

the standoff. Apply non-hardening mastic

around outside edge of standoff. Position the

standoff/cap assembly in the center of the 10

3

/

4

" square hole and attach to exterior wall

with wood screws provided (see Figure 14).

The siding standoff must sit flush against the

exterior fascia material.

7.

Combustible Exterior Wall Only:

Fit the outer

and inner wall firestop into the wall before

connecting horizontal run to vent cap (see

Figure 15).

Figure 13 - Installing Horizontal Vent Cap

(Noncombustible Exterior)

Wood Screw

Vent Cap

Figure 14 - Installing Siding Standoff

(Combustible Exterior Wall)

Cut Siding Away
to Fit Standoff

Screws

Standoff

Vent
Cap

Apply Mastic
to All Four Sides

8. Carefully move fireplace, with vent assembly

attached, toward wall and insert vent pipe

into horizontal termination. The pipe overlap

should be a minimum of 1

1

/

4

".

9.

Combustible Exterior Wall Only:

Slide wall

firestop against interior wall surface and attach

with screws provided (see Figure 16, page

13). See Figure 17, page 13, for horizontal

termination details.

10. Place fireplace into position and shim with

noncombustible material, if needed. Nail or

screw side flanges to framing to secure unit in

place. IMPORTANT: Make sure fireplace is

level before securing. If fireplace is not level

it will not work properly.

NOTICE: Do not seal termination

cap to vent pipe. Cap must be

removable for vent inspection

and maintenance.

Figure 15 - Installing Outer Wall Firestop

(Combustible Exterior Wall)

Inner Wall
Firestop

Inner Wall
Firestop

Inner Wall
Firestop