Start-up check sheet for 90+ furnace – Sears 9MPD125L20B1 User Manual
Page 2
Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

START-UP CHECK SHEET
For 90+ Furnace
(Keep this page for future reference)
Dealer Name:_
Address:_____
City, State(Province), Zip or Postal Code:_
Phone:
Owner Name:.
Address:_____
City, State(Province), Zip or Postal Code:_
Model Number:________________________
Serial Number:_________________________
Type of Gas:
Natural:
□
LP:
□
Which blower speed tap is used?
(Heating)__________ (Cooling)___
Temperature of Supply Air:
Temperature of Return Air:
(+)_
(+)_
_or(°C)_
_or(°C)_
Rise (Supply Temp.-Return Temp.): (°F)_____or(°C)_
Fiiter Type and Size:__________________________
Fan "Time ON" Setting:_
Fan "Time OFF" Setting:_
Dealer Comments:
Business Card Here
Manual Gas Shut-Off Upstream
of Furnace/Drip-Leg?
YES
□
NO
□
Condensate Drain Connected? YES □ NO □
Condensate Drain Trapped? YES □ NO □
Transition Pressure switch hose relocated for U/D/H
Application? YES □ NO □
Blower Speed Checked? YES □ NO □
All Electrical Connections Tight? YES □ NO □
Gas Valve OK? YES □ NO □
Measured Line Pressure When Firing Unit:____________
Calculated Firing Rate:(See
Checks and Adjustments Sec
tion).____________________________________________
Temperature Rise (supply-return temperature):(°F)_______
Measured Manifold Gas Pressure:____________________
Static Pressure (Ducts): Supply Air_
Date of Start-Up:________________
CO? _________________________
C 0 2 ? ________________________
Return
H]
440
01 1020 04