beautypg.com

Carrier 51CM User Manual

Page 8

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

background image

Fig 9 ~ Sensing Bulb and Service Cord Screws

TIMER
REMOVAL
SCREWS (2)

TIMER COOL-HEAT

FAN

CONTROL AND CYCLE
SCREWS (2)

SWITCH

Fig. 11 — Control Locations

12

Fig. 10 — Removing Knobs

b Caieiully pull wires iiom teiminals of fan cycle

switch Label oi mark wires to aid in proper wire
lepla cement

c Reverse above procedure for reinstalling fan cycle

switch

1 Thermostat — See Thermostat location in Fig 11

a Remove 2 screws holding thermostat to control

box

b Carefully pull wires from thermostat terminals

being sure to label or mark wires to aid in correct
wire replacement

c Remove insulating sleeves trom thermostat bulb

d Rerfiove thermostat and bracket itom control

box

e Remove thermostat from bracket by removing 2

screws

f Reverse above procedure to reinstall thermostat

Run Capacitor — See Run Capacitor in Fig 12

a Discharge capacitor before disconnecting by

shorting across terminals with a screwdriver

b Remove screw fastening capacitor strap to parti­

tion assembly and remove strap

c Carefully pull wires from run capacitor terminal

Mark or label wires for correct reassembly

d Reverse above procedure for reassembly

RUN CAPACITOR

RUN CAPACITOR

Fig. 12 — Run Capacitor

13 Fan Motor — See Fan Motor in Fig 13

a Loosen set screw on blower wheel See Fig 14
b Remove clip from condenser ian See Fig 14

c Disconnect fan motor wires from control box and

capacitor