TriangleTube Prestige Cascade System User Manual
Page 28

25
Boiler Piping
SECTION IV – BOILER PIPING
General
Ensure that the maximum boiler and distribution
manifold working pressure does not exceed the max-
imum pressure rating of the boiler.
Connect the supply piping and return piping from the dis-
tribution manifold to each boiler. If necessary to align the
supply and return pipes you can slide the boiler(s) on the
boiler mounting bracket(s).
Use a high quality sealant for sealing all threaded con-
nections, similar to Loctite 577. Assemble and tighten
pipes in the proper orientation within the sealants
working/cure time.
Pipe individual boilers as shown in the appropriate figures
1 through 18, pages 3-18.
NOTICE
NOTICE