TriangleTube Prestige Cascade System User Manual
TriangleTube Equipment
Installation of boilers must comply with local requirements and codes and with the
National Fuel Gas Code NFPA 54, ANSI Z223.1 for installations within the U.S. For
installations in Canada the installation must comply with CAN/CSA B149.1.
WARNING
Cascade Multiple Boiler Distribution
Manifold and Hydronic Junction for
PRESTIGE Solo 250 or PRESTIGE Solo 399 Boilers
NOTICE
2011-40 Prestige Cascade Manual
This document is intended to be used by a qualified heating contractor or service
technician. Read all instructions within this document, the PRESTIGE Boiler
Installation and Maintenance Manual and Prestige Vent Supplement before proceed-
ing with the installation. It is recommended to follow the procedures in the steps
given, skipping or missing procedural steps could result in severe personal injury,
death or substantial property damage.
Revised 3/25/13