beautypg.com

Slant fin corp, Chs series installation and operation instructions – Slant/Fin CHS-399 User Manual

Page 9

background image

CHS Series

Installation and Operation Instructions │

Slant Fin Corp.

9


Figure 3-1 Closet Installation, Minimum Clearances

(Model CHS 85-110 Shown)

Ventilation Air Openings
are not required if the
boiler area meets the
Recommended

Clearances

listed in Table 3-1.

Bottom ventilation
opening

Max. 6” above

floor / bottom

Top ventilation opening
M

ax. 6” below ceiling / top

Sides = 4”

Front = 6”

(if removable)

Removable surface /
closet door

Ventilation air opening
1in

2

per 1000 Btu/hr,

min. 100in

2

Ventilation air opening
1in

2

per 1000 Btu/hr,

min. 100in

2

Min. 1” clearance

for hot water and

vent pipes

B

ottom = 9”

Top = 12”

This manual is related to the following products: