beautypg.com

Reznor DV Operation Manual (for units built before August 2003) User Manual

Page 8

background image

Form

O-DV/RDF/ADF, P/N 148385, Page 7

2. Remove the service panel and the junction box door. Disconnect the two-

line voltage power supply wires from the terminal block inside the junc-
tion box.

3. Disconnect the water feed line hose from the upstream side of the ball

valve.

4. Unscrew the four sheet metal screws holding the junction box to the

cooling module. Remove the junction box-pump-float switch assembly
(See Figure 8).

5. Dislodge the inlet basket screen from the pump and clean any buildup of

debris and dirt. Carefully remove the base cover plate from the bottom of
the pump. Using a mild soap solution, wash all deposits from the inside of
the pump and remove all debris from the impeller.

6. Reassemble the pump. Replace the parts in exact reverse order, being

careful that everything is returned to its proper position.

FIGURE 8 - Remove
Junction Box, Pump, and
Float Switch as an Assembly
(Actual assembly may not
appear exactly as in the photo.
Applies to evaporative
cooling module with float and
pump control system only. )

Pump

Junction Box

(Note: Only 208V unit

will have a transformer in the junction box.)

Float

Switch

Pump
Motor

Carefully remove basket and
snap-on cover plate to clean
pump.

REFERENCE: Evaporative Cooling Module Troubleshooting
Guide, Paragraph 20, page 23.