Reznor B5SM Unit Installation Manual User Manual
Page 20

table 9. Maintenance schedule
Specifications & illustrations subject to change without notice or incurring obligations.
O’ Fallon, MO | Printed in U.S.A. (02/11)
7092590 (Replaces 7090950)
I
nstallers
n
ame
: _________________________________
D
ate
I
nstalleD
: _________________________________
MAIntEnAnCE tAsK
PErForMAnCE
sCHEDuLE
DAtE PErForMED
W
M
sA
A
AIr FILtErs
Inspect, clean, or replace as required.
X
ConDEnsAtE DrAIn(s) & PAn
Clean condensate drain pan
X
Inspect the flow of condensate through the
drain lines. Clean or correct problems as
necessary.
X
BLoWEr AssEMBLY
Inspect the fan belt for wear, alignment,
& proper tension. Replace or adjust as
required.
X
Clean the blower wheel and housing
X
Inspect the blower assembly and hardware
for corrosion. Is the hardware secured tightly.
X
Inspect the blower coil unit casing for
corrosion and loose fasteners
X
CoILs
Inspect the coil fins for excessive dirt or
damage. Clean or repair if required.
X
Inspect all coil connections for leaks.
X
AIr HAnDLEr AssEMBLY
Inspect mounting hardware for corrosion.
Is the hardware secured tightly.
X
Inspect filter rack mounting hardware. Is it
secured to the unit tightly?
X
Inspect panel asemblies for proper
installation and security.
X
notE: The schedule above is for normal duty applications only. For severe duty applications, adjust schedule as appropriate. Additional tasks
may be required for severe duty applications. W = Weekly, M = Monthly, SA = Semi Annually, A = Annually
InstALLEr: PLEAsE LEAVE tHEsE
InstruCtIons WItH tHE oWnEr.