beautypg.com

Reznor B5SM Unit Installation Manual User Manual

Page 20

background image

table 9. Maintenance schedule

Specifications & illustrations subject to change without notice or incurring obligations.
O’ Fallon, MO | Printed in U.S.A. (02/11)

7092590 (Replaces 7090950)

I

nstallers

n

ame

: _________________________________

D

ate

I

nstalleD

: _________________________________

MAIntEnAnCE tAsK

PErForMAnCE

sCHEDuLE

DAtE PErForMED

W

M

sA

A

AIr FILtErs
Inspect, clean, or replace as required.

X

ConDEnsAtE DrAIn(s) & PAn
Clean condensate drain pan

X

Inspect the flow of condensate through the
drain lines. Clean or correct problems as
necessary.

X

BLoWEr AssEMBLY

Inspect the fan belt for wear, alignment,
& proper tension. Replace or adjust as
required.

X

Clean the blower wheel and housing

X

Inspect the blower assembly and hardware
for corrosion. Is the hardware secured tightly.

X

Inspect the blower coil unit casing for
corrosion and loose fasteners

X

CoILs

Inspect the coil fins for excessive dirt or
damage. Clean or repair if required.

X

Inspect all coil connections for leaks.

X

AIr HAnDLEr AssEMBLY

Inspect mounting hardware for corrosion.
Is the hardware secured tightly.

X

Inspect filter rack mounting hardware. Is it
secured to the unit tightly?

X

Inspect panel asemblies for proper
installation and security.

X

notE: The schedule above is for normal duty applications only. For severe duty applications, adjust schedule as appropriate. Additional tasks
may be required for severe duty applications. W = Weekly, M = Monthly, SA = Semi Annually, A = Annually

InstALLEr: PLEAsE LEAVE tHEsE

InstruCtIons WItH tHE oWnEr.