beautypg.com

Reznor B Option - Power Venter Installation User Manual

Page 9

background image

Form I-F/B-PV, P/N 97967R2, Page 9

FIGURE 14 - Wiring Diagram of Model F or Model B with Optional Power Venter

L1

(HOT)

BK

R

24V

LINE VOLT

BR

R

Y

GROUND TERMINAL

(TERMINAL STRIP)

L2

(COM)

115/1/60, 208/1/60 OR 230/1/60

BR

R

SET ANT

. A

T 1.0 AMPS

OPTIONAL SINGLE ST

A

GE

THERMOST

AT

W

R

W1

R

FIELD WIRING

TERMINAL STRIP

FA

CT

OR

Y WIRING

W

W

BK

BK

GRD

G

BR

CONTROL

TRANSFORMER

Y

BK

AL

TERNA

TE HONE

Y

WELL

REDUNDANT

GAS V

AL

VE

BL

PIL

O

T

OR PV

TH-TR

TH OR

MV

BR

PV-MV

TR OR

MAIN

BK

VENTER MOTOR

W

W

BK

BK

BK

VENTER TIME DELAY

RELAY CONTACTS

BR

RELAY CONTROL

C

R

VENTER TIME DELAY

BR

BR

BL

SWITCH

BLOCKED VENT

MANUAL RESET

Y

Y

Y

Y

LIMIT

CONTROL

R

VENTER

SWITCH

W

FLOW

Y

SP-DT

DELAY RELAY

VENTER TIME

CONTACTS

W

COM-2

O

NO-2

NC-2

Y

PIL

O

T

W

.R.

OR R

OBER

TSHA

W

REDUNDANT

GAS V

AL

VE

P

MAIN

M

C

R

WHITE - W

PURPLE - PR

BLUE - BL

GREEN - G

YELLOW - Y

ORANGE - O

RED - R

BROWN - BR

BLACK - BK

WIRING CODE

NOTES

- THE FOLLOWING CONTROLS ARE FIELD INSTALLED OPTIONS:
THERMOSTAT AND S/W SWITCH
- THE FOLLOWING CONTROLS ARE FACTORY INSTALLED OPTIONS:
NONE
- DOTTED WIRING INSTALLED BY OTHERS.

- USE #18 GA WIRE FOR ALL WIRING ON UNIT.
- LINE AND BLOWER MOTOR BRANCH WIRE SIZES SHOULD BE OF A SIZE TO
PREVENT VOLTAGE DROPS BEYOND 5% OF SUPPLY LINE VOLTAGE.

- SEE INSTALLATION INSTRUCTIONS FOR GREATER DETAIL.

ON 115V. UNITS THE CONTROL TRANSFORMER IS A SINGLE VOLTAGE PRIMARY.

- ON 230V. UNITS THE CONTROL TRANSFORMER HAS A DUAL VOLTAGE PRIMARY.

FOR 115V. UNITS USE BLACK AND YELLOW LEADS.

FOR 208V. UNITS USE BLACK AND RED LEADS (CAP YELLOW).

FOR 230V. UNITS USE BLACK AND YELLOW LEADS (CAP RED).

A TEMPERATURE RATING OF AT LEAST 105 DEGREES C., EXCEPT FOR SENSOR

MUST BE REPLACED, IT MUST BE REPLACED WITH WIRING MATERIAL HAVING

- CAUTION: IF ANY OF THE ORIGINAL WIRE AS SUPPLIED WITH THE APPLIANCE

LEAD WIRE WHICH MUST BE 150 DEGREES C.

BL

BK

IGNITION

CONTROLLER

PROBE

GRD

SPARK

FLAME SENSING

24V

MV/PV

GND BURNER

24V GND

MV

SENSE

TH

PV

G

UNIT CHASSIS

GROUND

BR

BK

BR

R

WIRE CONNECTOR

CRIMP TERMINAL

FACTORY WIRING

FIELD WIRING

FACTORY SUPPLIED FIELD

INSTALLED WIRING

OPTIONAL FIELD WIRING

OPTIONAL (CH1 OPTION) FIELD WIRING

OPTIONAL (BF4 OPTION) FACTORY WIRING
OR

5

4

2

R

G

W

BL

W

R

COM-1

NO-1

OPERATING SEQUENCE

- SET THERMOSTAT AT LOWEST SETTING.
- TURN ON MAIN AND PILOT MANUAL GAS VALVES.
- TURN ON POWER TO UNIT.
- SET THERMOSTAT AT DESIRED SETTING.

A TIME DELAY OF APPROX. 30 SECONDS.

- THERMOSTAT CALLS FOR HEAT ENERGIZING THE VENTER MOTOR AFTER

- VENTER FLOW SWITCH CLOSES FIRING UNIT AT FULL RATE AFTER PILOT

- FAN CONTROL SENSES HEAT EXCHANGER TEMPERATURE, ENERGIZING

- IF THE FLAME IS EXTINGUISHED DURING MAIN BURNER OPERATION,
THE SAFETY SWITCH CLOSES THE MAIN VALVE. IF THE PILOT IS
NOT ESTABLISHED WITHIN 120 SEC. THE UNIT LOCKS OUT FOR
ONE HOUR, UNLESS IT IS RESET BY INTERRUPTING POWER TO
THE CONTROL CIRCUIT. (SEE LIGHTING INSTRUCTIONS)

THE FAN MOTOR.

PROVING SEQUENCE.

- SET THERMOSTAT AT LOWEST SETTING FOR SHUTDOWN.

- WHEN THE THERMOSTAT IS SATISFIED, THE GAS VALVE CLOSES AND
THE VENTER MOTOR RUNS FOR APPROX. 45 SEC.

ICM

ICM

ICM

O

Consult diagram on heater for

details on fan/blower circuit.

This manual is related to the following products: