Media Pads

Screen

Screen Retainer

Top Pad

Retainer

Screw

Bottom Pad

Retainer

FIGURE 4A - Removing (and

Re-Installing) Media Pads

Install clamps

on one side

of cooler.

Catch Pad

Mounting Trough

Catch

Pad

Catch

Pad

Catch

Pad

Clamp

Step

3

Step

2

Step

1

FIGURE 4B - Install Moisture Elimination Catch

Pads, Option ASA1, on Sizes 180 and 360 (See

parts list, page 4.)

Install Moisture Elimination Pads (FIGURE 4B)

1) Prepare module by attaching two catch pad clamps

to one side of the cooler’s front legs. Screw through

the legs into the clamp with four of the #10 x 1/2”

long sheetmetal screws.

2) Prepare catch pads by assembling them together.

Use three of the #10 x 1/2” long sheetmetal screws.

3) Guide the catch pad assembly through the inlet

of the cooling module and place the bottom of the

lower pad into the catch pad mounting trough.

The screen part of the catch pad assembly should

always be facing the attached air mover. Slip the

catch pad assembly into the two slots located in the

catch pad clamps installed in Step (1).

4) With the pads in place, complete the assembly by

sliding one of the two remaining clamps over the

middle seam where the assembled catch pads

meet. Slip the other clamp over the top catch pad

frame and fasten both clamps to the cooling module

leg using sheetmetal screws.

After completing installation of the moisture elimination

pads as shown in

FIGURE 4B, re-install the media pads

removed in

FIGURE 4A. Refer to FIGURE 4C before

re-installing media pads.

45°

Airflow

to S

pace

Out

side

Airflow

IMPORTANT: Cooling media is made up of two

different sheets of cooling material. Each has its own

unique angle. When replacing the cooing media, BE

CERTAIN the 45° angle slopes downward toward

the incoming outside air. If the media is not installed

properly, water blowoff from the media pads will occur.

FIGURE 4C - Airflow Direction through the

Media Pads

3.2 Water Flow

Controls and

Connections

3.2.1 Water Flow Controls

Water flow is controlled by either a float and recirculating pump system or a timed

metering system. Follow the instructions for the type of controls on the evaporative

cooling module being installed. Float and recirculating pump type controls are identi-

fied on the wiring diagram as

Option ECD2. AquaSaver timed metering controls are

identified as

Option ECD1.

Reverse Steps

in FIGURE 4A to

replace the media.

Media must be

installed with the

airflow direction as

shown here.

FIGURE 5 - Re-position

the pump/junction

assembly.

For shipping, pump/

junction box assembly

is attached at the top.

Remove pump/junction

box assembly from

shipping position

(above) and re-attach

in “working” position.

To avoid shipping damage, the

pump/junction box assembly is

attached to the top of the side

panel for shipment. Support

the pump and remove the four

screws that hold the assem-

bly in position. Re-position the

assembly as shown in

FIG-

URE 5, and attach using the

same screws.

3.2.2 Re-position

Pump Assembly (Opt

ECD2, float & pump

only.)