Appendix e, Aerco, Pl-a-135 – AERCO KC1000 Heater 2002 User Manual
Page 89

APPENDIX E
E-5
1 1/2" SAFETY SHUT-OFF VALVE
DIFFERENTIAL PRESSURE REGULATOR W/ BROWN SPRING
BURNER/GAS VA. ADAPTOR
2
3
4
5
1
GM-161095
GAS COCK
GP-122415
GP-122409
1
1
124150
1
5
3
4
2
1
1
124138
1
SSOV ACTUATOR
FRONT VIEW
LEFT SIDE VIEW
REAR VIEW
DESCRIPTION
ITEM
PART NO.
REQ
PARTS LIST
AERCO
INTERNATIONAL, INC.
NORTHVALE, NJ 07647
(FACTORY MUTUAL)
APPD.
SCALE
DATE
CZ
DWN.BY
DATE
043002
PL-A-135
D
REV.
6
7
GP-122548
6
1
SPRING (BROWN) FOR DIFFERENTIAL PRESSURE REGULATOR
- THE SECOND O-RING (NOT SHOWN IN THE DRAWING) GOES TO THE GAS OUTLET FLANGE OF THE AIR-FUEL VALVE.
*
GAS TRAIN O-RING
*
GP-122406
2
7
RIGHT SIDE VIEW
KC1000 NAT. GAS TRAIN ASSEMBLY
8
8
9
GP-122403
GP-122412
1
1
LOW GAS PRESSURE SWITCH
HIGH GAS PRESSURE SWITCH
*
*
*
*
*
*
- WHEN ORDERING GAS TRAIN ASSEMBLIES, THE GAS PRESSURE SWITCH IS ORDERED SEPARATELY
9
"FOR BOILER ONLY"
REF LOCATION OF
HIGH GAS
PRESSURE SWITCH
- AERClean (12 pages)
- ProtoNode Gateway Rev 1 (with internal LEDs) (64 pages)
- ProtoNode Gateway Rev 3 (with external LEDs) (126 pages)
- Control System (ACS) (144 pages)
- Belimo F6...HD/HDU Series Valve (44 pages)
- Belimo AF120-S US Actuator (9 pages)
- Belimo AMX24-MFT Actuator (9 pages)
- Belimo GKX24-MFT Actuator (9 pages)
- Belimo Motorized Valves Installation (20 pages)
- BMS II BOILER (108 pages)
- BMS II BOILER MODBUS Communication (100 pages)
- BMS 168 (86 pages)
- Boiler Valve Controller (BVC) PRIOR to Serial-12-840-1 (35 pages)
- Boiler Valve Controller (BVC) (38 pages)
- Buffer Tanks (14 pages)
- Combination Control Panel (CCP) (4 pages)
- XPC GATEWAY Communications (193 pages)
- Domestic Water Storage Tank (19 pages)
- Steam Traps (6 pages)
- X100 – Inhibitor (4 pages)
- AM Series Boiler User Manual (156 pages)
- AM Series Boiler Cascade Sequencer Controller (26 pages)
- AM Series Boiler Modbus Interface Manual (18 pages)
- BMK 1.5 LN October 2012 (166 pages)
- BMK 1.5 LN July 2011 (152 pages)
- BMK 1.5 LN June 2010 (123 pages)
- BMK 1.5 LN May 2009 (111 pages)
- BMK 1.5 LN Dual Fuel Feb 2013 (162 pages)
- BMK 1.5 LN Dual Fuel June 2010 (139 pages)
- BMK 1.5 LN Dual Fuel Jan 2009 (126 pages)
- BMK 1500-2000 (188 pages)
- BMK 1500DF (196 pages)
- C-More Control Panel (162 pages)
- BMK 2.0 LN October 2012 (172 pages)
- BMK 2.0 LN Natural Gas (SN G-11-1861 and above) (170 pages)
- BMK 2.0 LN Nat. Gas June 2010 (125 pages)
- BMK 2.0 LN Natural Gas 2008 (111 pages)
- BMK 2.0 LN Nat. Gas for Mass. only (113 pages)
- BMK 2.0 LN Dual Fuel Serial G-11-2402 and UP (160 pages)
- BMK 2.0 LN Dual Fuel Nov 2010 (139 pages)
- BMK 2.0 LN Nat. Gas (112 pages)
- BMK 2.0 LN for Mass. only (114 pages)
- BMK 3.0 LN Dual-Fuel Series Gas Fired Low NOx Boiler System (136 pages)
- BMK 3.0 LN Natural Gas July 2011 (129 pages)
- BMK 3.0 LN Nat. Gas Jan 2011 (129 pages)