1.3 Manager Heater Preparation

NOTE

Ensure that the heater being wired as the managing heater is the

one installed closest to the low loss header.

1.3.1 Manager Heater Preparation - Communications Board

To electrically prepare an AM Series heater/boiler for use as the Managing appliance for the

Cascade Sequencer, follow the instructions below.

Wiring the Manager Heater Communications Board

1. Gain access to the inside of the electrical junction box by removing the unit top cover and

the electrical junction box top cover (see Figure 1-3).

Figure 1-3: Accessing the Junction Box of the Managing Heater

2. Locate the communication board cover inside the junction box (see Figure 1-4).

Figure 1-4: Locating the Comm. Board inside the Electrical Junction Box

Communications

Board Cover

Communications

Board Cover

Junction Box

Top Cover

Unit Top Cover

Top Cover Screw