beautypg.com

3 list of abbreviations, 4 health and safety approval – BUCHI Rotavapo R-100 User Manual

Page 57

background image

BÜCHI Labortechnik AG

Appendix | 10

Operation Manual Rotavapor® R­100

57/60

10.3

List of abbreviations

Abbreviation

Meaning

ADR

Accord européen relatif au transport international des marchan­
dises dangereuses par route (European Agreement concerning the
International Carriage of Dangerous Goods by Road)

DKD

Deutscher Kalibrierdienst (German Calibration Service)

EPDM

Ethylene propylene diene monomer

FEP

Fluorinated ethylene propylene

FFKM

Perfluoro­elastomer

FPM

Fluorinated propylene monomer

GGVE

Gefahrgutverordnung Eisenbahn (German Hazardous Goods Reg­
ulations for Railways)

GGVS

Gefahrgutverordnung Strasse (German Hazardous Goods Regula­
tions for Road Transport)

NBR

Nitrile butadiene rubber

PBT

Polybutylene terephthalate

PETP

Polyethylene terephthalate

PTFE

Polytetrafluoroethylene

RID

Règlement concernant le transport international ferroviaire de
marchandises dangereuses (Regulations concerning the Interna­
tional Carriage of Dangerous Goods by Rail)

10.4

Health and safety approval

To guarantee the health and safety of our staff and to comply with the law and the reg­
ulations for handling hazardous materials, for the purposes of health and safety at
work and safe disposal of waste, no products may be sent back to BÜCHI Labortech­
nik AG or repaired unless we have received the declaration below, completed and
signed.

Products sent to us will not be accepted for repair or DKD calibration until we have re­
ceived this declaration.

u

Copy the form overleaf and complete it.

u

Make sure that you know the full details of the substances with which the device
has been in contact and the all questions have been answered fully and correctly.

u

Send the completed from to us in advance by post or fax. The declaration must
reach us before the device.

u

Enclose a copy of the declaration with the device.

u

If the product is contaminated, inform the carrier (in accordance with GGVE/GGVS/
RID/ADR).

If the declaration is missing or the procedure described is not followed, the repairs will
be delayed. We ask for your understanding and cooperation with regard to these mea­
sures.