8 setting up and filling the heating bath, 9 quick check, Important – BUCHI Rotavapo R-100 User Manual
Page 26
5 | Installation
BÜCHI Labortechnik AG
26/60
Operation Manual Rotavapor® R100
5.8
Setting up and filling the heating bath
1
2
u
Locate the heating bath (1) in the Lshaped cutout in the Rotavapor base (2).
IMPORTANT
Risk of heating bath corrosion due to use of unsuitable heating fluid
u
Do not use pure distilled water or deionised water.
u
If pure distilled or deionised water has to be used, add 1 to 2 g of Borax (Na
2
B
4
O
7
x 10 H
2
O) per litre of water.
The recommended fluid for use in the heating bath is water. Normal tap water may be
mixed with distilled water with a mixing ratio of up to 1:1 according to the water hard
ness.
u
Fill the heating bath with suitable fluid.
5.9
Quick check
u
To complete the installation process, check the following points:
u
Switch on the rotary drive unit, change the rotation speed and check that the evap
orating flask rotates at a different speed.
u
CAUTION! Risk of skin burns. Make sure that the heating bath is filled, switch on
the heating bath and check that the heating fluid heats up (Chapter 6.1.1 "Prepar
ing the heating bath", page 27).
u
Check that the height of the rotary drive unit can be adjusted (see Chapter 6.1.5
"Vertical adjustment", page 30).